DNO approval takes 8-12 weeks and equipment procurement needs to align with that window - without a central system installers often order panels too early, tying up cash, or too late, delaying the installation date after approval comes through.
Commercial solar proposals involve multiple cost variables - panels, inverters, mounting systems, electrical works, scaffolding - and any missed item in the quote becomes an unrecoverable cost once the project is underway.
MCS certification and G99 documentation require structured test records captured on-site - paper-based processes lead to missing signatures, incomplete data, and certification delays that hold up the final invoice.
See it live
Want to see this workflow in Zigaflow?
Book 30 minutes with Tim and we'll run through your exact process live.
Book a free demo →Build your own workflowAV - Corporate Conferencing Room Installation
How to manage a corporate AV conferencing room project from site survey through design approval, hardware procurement, first and second fix installation, commissioning, and client sign-off.
AV Dry Hire Kit Dispatch and Return
Covers the end-to-end process for an AV hire business managing dry hire kit - from deposit collection and kit prep through signed dispatch, return inspection, damage resolution, and final invoicing.
Audio-Visual - Managing an AV Equipment Hire Job
A complete operational workflow for AV hire businesses, covering written booking confirmation through kit preparation, dispatch, show-day additions, kit return and condition check, and same-day invoicing.
Got a different workflow?
Describe your process in plain English and we'll map it to Zigaflow in seconds.
Build my workflow →