Site surveys are booked without capturing enough electrical detail, so quotes miss consumer unit upgrades or extended cable runs - the job ends up costing more than quoted and the margin disappears.
OZEV grant eligibility is not confirmed before the customer commits, causing the job to stall when the installer discovers the customer is ineligible after the quote has already been accepted.
Commissioning paperwork - electrical installation certificate, DNO notification confirmation, and as-installed record - is completed informally and takes days to compile for the customer handover pack after the job is physically complete.
See it live
Want to see this workflow in Zigaflow?
Book 30 minutes with Tim and we'll run through your exact process live.
Book a free demo →Build your own workflowAudio-Visual - Managing an AV Equipment Hire Job
A complete operational workflow for AV hire businesses, covering written booking confirmation through kit preparation, dispatch, show-day additions, kit return and condition check, and same-day invoicing.
AV System Integration - Running the Commissioning and Handover Process
A structured workflow for AV system integrators running the commissioning and handover phase of an installation project - covering pre-commissioning checks, component and signal flow testing, end-user acceptance, handover pack compilation, and same-day invoicing. Ensures the commissioning milestone is documented, signed off, and invoiced on the day it is achieved.
Construction - Daywork Recording and Billing
Covers the end-to-end process for recording daywork on a construction project - from confirming the instruction and briefing operatives through daily sheet completion, obtaining signatures, and submitting the claim with the application for payment. For contractors managing time-and-materials work on any contract form.
Got a different workflow?
Describe your process in plain English and we'll map it to Zigaflow in seconds.
Build my workflow →