In short
Record location, component, grade, photo and action for every racking finding so each one can be priced immediately. Capture them on site in a structured form and send the repair quote while the report is fresh.
A racking inspection report only pays for itself when its findings become an approved repair quote. Here is what each finding should record, and how to price and send the repair while the report is still fresh with the customer.
A racking inspection report should record, for every finding, the bay or run reference, the component affected, what was measured, a risk grade, a photo and a recommended action. Written that way, each line is already the skeleton of a repair quote line. The route from report to approved repair quote is short: capture findings on a tablet at the rack, hold them against the customer's record, price them in that same record, and send the quote while the report is still the thing the warehouse manager is talking about. Inspection businesses rarely lose repair work on price. They lose it in the days between the report and the quote.
What each finding needs to carry
One racking inspector's published walkthrough describes the report as listing every defect with its location by bay or run reference, the component, what was observed or measured, its classification, a photograph and a recommended action. That is a good test for any report format. If a line lacks one of those, somebody in the office has to guess or phone the inspector, and the quote slips.
Location matters most. A finding of "damaged upright" cannot be priced or scheduled. "Aisle 4, bay 12, left upright, front face, kinked at 400 mm" can. The same source notes that consistent bay references make a report far easier to act on afterwards, so mark them before the visit if the racking is not already labeled.
Grade matters next. The traffic-light system classifies damage against BS EN 15635 tolerances: green is within tolerance and monitored, amber is outside tolerance but safe for short-term use and commonly has to be replaced within about four weeks, and red means the bay is offloaded and isolated immediately. Both inspection firms we read describe it this way. The grade is a ready-made priority for the quote: red lines first, amber lines with a date, green lines left off or listed as monitored.
Photo per finding
Attach the photo to the finding itself, not to a folder for the whole visit. The customer approving a repair wants to see the exact upright they are paying to replace.
Where the report-to-quote gap opens
The usual sequence is familiar. The inspector fills in a paper sheet or a document on site, drives back, writes it up, and the report goes out within a couple of days. Then a second person re-reads the findings, retypes the customer's details, and builds a repair quote from the notes. By the time it lands, the customer has dealt with the red items, put the amber list in a drawer, or asked someone else to price it.
Zigaflow's racking inspection page names this directly: the inspection finds damaged components, and the repair is then quoted separately, from notes, to a customer whose details are typed in again. Its eForms App page describes the same drift from the field side, with inspection reports sitting in a van for days before reaching the office. Neither delay is about effort. Each one is a handoff, and each handoff is a chance for the customer to move on.
Capture on site so the office does not retype
The fix is to make the site record structured. Zigaflow does not ship a racking inspection report, and says so on its racking inspections page. You build the form you already use as an eForm, and your inspectors complete it in the eForms App. According to the app page, it works offline, captures photos with annotations, e-signatures and GPS location, uses conditional logic so a failed item opens extra questions, and supports repeatable sections so an inspector who finds five damaged uprights instead of three adds two more entries. Each item syncs back as its own structured record.
For a racking report, that means a failed item can require a photo, a bay reference and a grade before the inspector moves on. Required fields stop the blank location that would otherwise stall the quote. Site sign-off by e-signature gives a dated record of the visit and who signed for it, which matters when a customer or insurer asks for the evidence later.
Price on the same customer record
Once findings are structured, the quote is a transcription of data you already have, not a rewrite. Zigaflow's racking inspections page describes raising the repair quote against the same customer record, with one-off lines for parts and labor, each with its own cost and sell price. The customer accepts and signs online, and acceptance raises the sales order. Parts can then be ordered from suppliers through purchase orders, one per supplier, and the job invoiced. Our racking and storage page covers that wider flow, and the racking inspections page covers the visit-to-repair path in particular.
Build the quote lines in grade order. Red items sit at the top as the urgent repair. Amber items follow with the replacement window stated. If you have a standard layout for racking work, start from the pallet racking quote template, and if repair pricing is where your margin leaks, the guide on how to price a pallet racking installation covers the cost lines worth checking. The quotes feature holds the quote itself.
Separate the finding from the price
One inspector we read quotes repairs separately so findings are never shaped by the value of the repair work. Keep that discipline. Grade the damage first, then price what the grade requires.
Send it while the report is fresh
Speed is the real lever. The same inspector's guide says the report is issued within 48 hours and that red-risk findings are reported on the day. Aim to have the repair quote reach the customer with, or very soon after, the report, because the customer is already thinking about the damage and the audit trail. A quote that follows a week later reads as a separate sales approach. One that arrives alongside the report reads as the next step in the same job.
Measure it. Track the hours from site sign-off to quote sent, and the share of reports that produce an approved repair quote. If the first number is in days and the second is low, the gap is where your repair revenue is going. Sorting that out does not need new inspectors or a lower price, only a record that carries from the rack to the quote without being typed twice.
Common questions
Sources
- Software for racking inspection and repairZigaflow · accessed 2026-11-25
- Mobile Data Collection App for Field TeamsZigaflow · accessed 2026-11-25
- Racking & Storage Software for Quotes and PurchasingZigaflow · accessed 2026-11-25
- What Happens in a SEMA Racking InspectionRackstor · accessed 2026-11-25
- SEMA Racking Inspection Guidelines for 2026Storage Concepts · accessed 2026-11-25