Office Furniture - Tender Response to Contract Award

Every tender won starts with a structured response.

Step by step

1
Tender Receipt and LoggingLeads

Log the tender reference, issuing body, submission deadline, estimated value, and contract duration. Assign a lead owner and set internal review deadlines.

2
Bid/No-Bid AssessmentLeads

Evaluate the tender against four criteria: contract value, qualification requirements, product fit, and pricing competitiveness. Document the decision before committing any specification resource.

3
Site Visit and SurveyeForms

Attend the site visit and record access constraints, floor loading limits, phased occupation requirements, and any other factors not captured in the tender documents.

4
Product SpecificationQuotes

Specify products from your manufacturer range against the client's schedule of accommodation or room data sheets, checking lead times and noting any proposed substitutions.

5
Bid Costing and PricingQuotes

Price each line item at contracted manufacturer rates plus delivery, installation, project management, and snagging allowance. Apply standard margin and cross-check against any stated budget.

6
Bid Writing and CompilationQuotes

Complete all required ITT sections - pricing schedule, method statement, case studies, quality questionnaires - using the evaluation criteria as the writing guide. Proofread against the submission checklist.

7
Submission and Outcome TrackingLeads

Submit the completed bid on time through the required channel. Log submission date, set a follow-up reminder, and record the outcome and any debrief feedback when received.

What this workflow solves

We spend 30 to 40 hours on a tender response and never hear back, and we have no way of tracking which tenders we have bid on, what we quoted, or whether our win rate is improving.

Pricing a large furniture tender accurately takes days of product research, manufacturer lead time checks, and installation cost estimation - and it all lives in separate spreadsheets that are out of date before we have finished.

When a tender requires a detailed room-by-room furniture schedule, we are manually building it in Excel while cross-referencing manufacturer price lists for 15 or more product lines, which takes far longer than it should.

Frequently asked questions

Modules used

See it live

Want to see this workflow in Zigaflow?

Book a demo and we'll run through your exact process live.

Book a free demo →Build your own workflow

Got a different workflow?

Describe your process in plain English and we'll map it to Zigaflow in seconds.

Build my workflow →