Lighting & electrical - commercial LED retrofit project

8 steps. Survey to certified handover.

Zigaflow Editorial

Published

Zigaflow Editorial publishes Zigaflow's guides, insights, industry resources, glossary and workflow pages. Zigaflow is responsible for what they say. Spotted an error? Email support@zigaflow.com.

Step by step

  1. Qualify the EnquiryLeads

    Confirm building type, floor area, fitting count, existing luminaire types, and whether emergency lighting, sensors, and dimming are in scope.

  2. Conduct Site SurveyeForms App

    Record the full luminaire schedule, circuit distribution, lux levels, emergency lighting coverage, and any existing control systems.

  3. Prepare Specification and Luminaire ScheduleQuotes

    Select replacement LED fittings, confirm mounting compatibility, specify emergency provisions and controls, and calculate projected energy savings.

  4. Submit Quote and ProgrammeQuotes

    Price supply-and-install works with a phased programme showing zone-by-zone installation sequence and access requirements.

  5. Issue Purchase OrdersPurchase Orders

    Order fittings, drivers, sensors, and emergency gear. Confirm lead times and map them against the planned installation start date.

  6. Schedule InstallationJobs

    Confirm site attendance dates, agree phased access with the client, and book any sub-contractors for controls programming or specialist commissioning.

  7. Install, Test, and CommissionWorks Orders

    Fit luminaires, connect circuits, configure dimming and controls, and conduct emergency lighting duration tests. Record all test results.

  8. Issue Certification and Handover PackInvoices

    Provide EIC or MEIWC certificates, emergency lighting commissioning records, updated luminaire schedule, and controls operating instructions. Release final invoice.

What this workflow solves

  • Emergency lighting scope not captured at survey stage, leading to additional materials, call-back visits, and certification rework at the contractor's cost.
  • Fitting lead times not mapped against the installation programme, causing schedule gaps, wasted site visits, and delayed completion.
  • Certification documents managed across emails and spreadsheets, delaying handover sign-off and holding up the final invoice.

Frequently asked questions

See it live

Want to see this workflow in Zigaflow?

Book a demo and we'll run through your exact process live.

Book a free demoBuild your own workflow

Got a different workflow?

Describe your process in plain English and we'll map it to Zigaflow.