Renewables - domestic solar and battery package: survey to commission
One enquiry. Two technologies. Full control.
Step by step
- Enquiry and CaptureLeads
Log the customer enquiry, capture current setup details, energy goals, and any site constraints such as listed building or conservation area status.
- Site SurveyeForms App
Attend site to assess roof, shading, consumer unit, and battery location under PAS 63100. Complete the survey form via the eForms App with measurements and photographs.
- System Design and QuoteQuotes
Build the combined package quote covering panels, inverter, battery, labour, circuit protection, and any consumer unit works. Include DNO notification and MCS compliance as deliverables.
- Acceptance and Deposit InvoiceInvoices
On customer acceptance, raise the deposit invoice and confirm the installation date. Communicate equipment lead times to the customer.
- Equipment ProcurementPurchase Orders
Issue purchase orders to panel, inverter, and battery suppliers. Track delivery dates against the installation date and sequence orders to avoid staggered arrivals.
- InstallationJobs
Install panels, inverter, and battery. Confirm PAS 63100 compliance for battery location. Fit circuit protection, isolation switches, and system labelling to BS 7671.
- DNO Notification and MCS RegistrationeForms
Notify the DNO of the completed installation. Register for the MCS certificate. Issue the Electrical Installation Certificate to the customer.
- Commissioning, Handover, and Final InvoiceInvoices
Commission the system, configure monitoring, walk the customer through the Smart Export Guarantee, and issue the full handover pack. Raise the final invoice.
What this workflow solves
- Quoting solar panels and battery storage together is complex, with different equipment, suppliers, and lead times that are difficult to track against a single confirmed installation date.
- DNO notification paperwork and MCS certification documentation gets lost between the survey and commissioning stages, leading to compliance delays that hold up the final invoice.
- There is no clear link between the accepted quote, the equipment purchase orders, and the live job, so cost overruns and delivery problems only become visible at the last minute.