Renewables - commercial solar O&M visit to invoice

Planned visit. Clean report. Invoice raised.

Zigaflow Editorial

Published

Zigaflow Editorial publishes Zigaflow's guides, insights, industry resources, glossary and workflow pages. Zigaflow is responsible for what they say. Spotted an error? Email support@zigaflow.com.

Step by step

  1. Schedule and NotifyJobs

    Confirm the visit date with the site contact and issue a pre-visit notification covering access arrangements, system changes since the last visit, and roof safety requirements.

  2. Engineer BriefingJobs

    Brief the engineer using the system record, last visit report, and inverter performance data so the engineer arrives with full context on the installation.

  3. Pre-Visit Kit CheckInventory

    Verify the van kit before departure: fuses, isolator spares, DC connector tools, cleaning supplies, and the O&M checklist loaded on the eForms App.

  4. On-Site Visual InspectioneForms App

    Carry out the visual inspection of panels, mounting rails, cabling, fixings, and isolator switches, recording condition against each item in the eForms App.

  5. Electrical Safety CheckseForms App

    Complete connection testing, insulation resistance measurement, earthing verification, and inverter fault history review; record all results in the site O&M report.

  6. Performance Review and CleaningeForms App

    Compare inverter output data against expected generation figures; clean panels where soiling or debris is present and note pre- and post-clean condition in the report.

  7. Defect EscalationWorks Orders

    If any faults require follow-up work beyond minor adjustment, raise a works order before leaving site so the remedial scope is tracked and billed separately.

  8. InvoiceInvoices

    On return to the office, close the job and raise the maintenance invoice against the customer account, linked to the completed O&M report.

What this workflow solves

  • Maintenance visits are booked but not tracked centrally, so engineers arrive on site without the system history or notes from the previous visit.
  • The O&M report is completed on paper and filed separately from the job record, meaning the service history and the invoice live in different places.
  • Defects found during a visit get noted verbally but no works order is raised, and the remedial job falls through the gaps.

Frequently asked questions

See it live

Want to see this workflow in Zigaflow?

Book a demo and we'll run through your exact process live.

Book a free demoBuild your own workflow

Got a different workflow?

Describe your process in plain English and we'll map it to Zigaflow.