A customer called about their inverter showing a fault code and we could not find the original commissioning report or serial numbers - it took three days just to get the warranty claim registered with the manufacturer.
We completed a workmanship repair within the 2-year MCS guarantee period but issued no updated paperwork, and the customer is now asking what happens if the same fault comes back.
A panel defect turned out to be covered by the manufacturer's product warranty, but they wanted an installer report we had not kept - the claim dragged on for six weeks longer than it should have.
See it live
Want to see this workflow in Zigaflow?
Book a demo and we'll run through your exact process live.
Book a free demo →Build your own workflowAV - Corporate Conferencing Room Installation
How to manage a corporate AV conferencing room project from site survey through design approval, hardware procurement, first and second fix installation, commissioning, and client sign-off.
AV - Digital Signage Supply and Installation
Covers the full workflow for a digital signage project: from enquiry and site survey through hardware procurement, on-site installation, CMS setup, and signed commissioning handover. Keeps delivery dates, kit lists, and sign-off in one place.
AV Dry Hire Kit Dispatch and Return
Covers the end-to-end process for an AV hire business managing dry hire kit - from deposit collection and kit prep through signed dispatch, return inspection, damage resolution, and final invoicing.
Got a different workflow?
Describe your process in plain English and we'll map it to Zigaflow in seconds.
Build my workflow →