Smart Export Guarantee eligibility: how to check and apply

Intermediate10 min read

Zigaflow Editorial

Published

Zigaflow Editorial publishes Zigaflow's guides, insights, industry resources, glossary and workflow pages. Zigaflow is responsible for what they say. Spotted an error? Email support@zigaflow.com.

In short

A solar system qualifies for Smart Export Guarantee payments with MCS-certified installation, an export-recording meter and a grid connection letter, and the owner applies to a supplier. Check all three before handover and compare tariffs at quote stage.

  • Ofgem's scheme covers eligible technologies in Great Britain up to 5MW, and the owner applies to a SEG licensee.
  • MCS-certified installation and products, plus an export-recording meter, are the practical conditions for most systems.
  • The DNO grid connection letter and MCS certificate belong in the handover pack, not in a follow-up email.
  • Export tariffs vary widely, so comparing them at quote stage makes export income part of the sale.

A solar system needs MCS certification, a meter that records exports and a grid connection letter before its owner can be paid under the Smart Export Guarantee. Here is how installers check each one before handover.

In Great Britain, a solar PV system (or small wind, micro-CHP, hydro or anaerobic digestion plant) qualifies for Smart Export Guarantee payments when it falls within the capacity limits, was installed by an MCS-certified installer using certified products, and has a meter that records what it exports. The owner applies, not the installer: the generator applies to a SEG licensee, which is an electricity supplier offering a SEG tariff. The installer's job is to make sure the paperwork the supplier asks for exists on the day of handover.

That split is where export income gets delayed. The owner finds the SEG application form weeks later, discovers there is no certificate or grid connection letter in the handover pack, and starts chasing the installer. A few checks before handover remove that delay, and a tariff comparison at the quote stage turns export income into part of the sale. This guide covers the checks and the application, in the order an installer meets them. It applies to installations in Great Britain, because Ofgem's scheme covers installations located there.

What the scheme requires

Ofgem sets the scheme's core rules. Eligible technologies are solar PV, wind, micro-CHP, hydro and anaerobic digestion, located in Great Britain with a total installed capacity of no more than 5MW, or 50kW for micro-CHP. Every SEG licensee must offer a tariff to all eligible generators, and that tariff must stay above zero. Beyond that, each licensee sets its own rate, contract length and application process.

MCS adds the practical conditions for most homes and small businesses: the system was installed by an MCS-certified installer using certified products, and a smart meter records the exported electricity. The Centre for Sustainable Energy adds that an installation by a company registered with either MCS or Flexi-Orb at the time of installation counts, and that panels not installed that way cannot be certified afterwards. A battery is not on Ofgem's technology list, so it is the generating technology that qualifies, not the battery.

1

Confirm the technology and capacity

Before the quote goes out, check that the generator is one of the five eligible technologies and sits under the capacity limit. For a typical domestic or small commercial solar PV system this is a formality. Write the confirmed capacity on the job record so the figure on the quote, the certificate and the application all match.

2

Confirm your MCS certification covers the work

The installation, the installer and the products all need to be certified. Check that your company is registered for the technology you are fitting, and that every panel and inverter on the quote appears as certified product. A system that fails this check cannot be fixed afterwards, so it belongs at quote stage, not handover.

3

Plan the export meter

Decide at survey who will confirm that the property has a smart meter able to record exports. Note the meter type on the survey. If there is no smart meter, tell the customer before they sign, and explain that the supplier will say how export readings are taken. This is the check most likely to surprise an owner.

4

Send the DNO notification and keep the proof

The grid connection letter, often called a DNO G98 letter, is one of the documents suppliers ask for. Submit the notification to the network operator on time, and save the confirmation in the job. If you need the detail, see the guide on filing a DNO notification after a solar install.

5

Issue the MCS certificate and build the handover pack

Issue the certificate at handover rather than after it. The pack should hold the MCS certificate, the grid connection letter, the installation receipt or proof of ownership, and a one-page SEG sheet. Our guide to issuing an MCS certificate at handover covers the certificate itself.

6

Help the customer choose a licensee

Ofgem advises generators to shop around, and the licensee does not have to be the customer's current energy supplier. Rates vary widely: the Centre for Sustainable Energy says they range from 1p to 25p per kWh, so a short comparison matters. Give the customer the current Ofgem list of licensees and the tariff features to compare, such as rate, contract length and payment frequency.

7

Support the application and chase the export MPAN

The customer sends the supplier the certificate, the grid connection letter and proof the system is theirs. Tenants need a letter from their landlord. The supplier then registers an export MPAN and asks for an initial export meter reading. The Centre for Sustainable Energy reports this can take 5 to 12 weeks, with payments backdated to the application date. Diarize a check-in call so the customer is not left waiting.

Put export income into the quote

An installer who mentions export income only after installation has already lost the best moment to use it. At quote stage, the customer is weighing payback. A tariff comparison, with the customer's likely export volume, gives them a clear picture of what the system earns, as long as the figures are presented as estimates, not promises. The Centre for Sustainable Energy notes that self-use usually saves more than exporting, and that a battery reduces exports, so be honest that export income depends on how the customer uses power.

In Zigaflow quotes, the quote is built from your product list, and an accepted quote becomes the job on Essentials and above. Adding a line or note for the SEG check keeps it in front of the sales team. Using document templates, you can print the same SEG explainer on every residential quote. Once the customer accepts, jobs carry the survey notes, DNO confirmation and certificate on one record, so nobody has to hunt for them at handover. For more on the sector, see our renewables industry page.

Common mistakes

Installers lose time in the same places. The certificate is issued weeks after handover. The DNO confirmation sits in an inbox. The customer is told to "contact your supplier" with no guidance. The meter is never discussed. Each is a quick fix with a checklist on the job, and each one shortens the time to the customer's first payment.

Common questions

The owner applies. Ofgem says generators apply to a SEG licensee, which is an electricity supplier offering a SEG tariff, and each licensee publishes its own application process on its website. The installer does not apply for the customer, but can make the application quicker by handing over the MCS certificate, the grid connection letter and proof of ownership at handover. Tenants usually also need a letter from their landlord.