Guides

Guides and playbooks

In-depth, practical guides for teams running their business on Zigaflow - from quoting to procurement to getting paid on time.

Type
Topic

148 guides, page 2 of 4

How-to guideIntermediate

How to quote and manage a brand ambassador merchandise programme

Brand ambassador merchandise programmes are complex to quote and run - quantities move, kits come in tiers, and every ambassador needs an individual despatch. This guide covers how to quote accurately in the ambiguity, hit a hard launch date, and set the programme up for ongoing replenishment.

12 min read
How-to guideIntermediate

How to quote and run a commercial mezzanine floor installation

Commercial mezzanine floor contractors lose margin at three points: the survey, procurement, and handover. This guide covers the full process from site survey to Building Control completion certificate, with practical steps for quoting accurately and collecting payment on time.

12 min read
How-to guideIntermediate

How to quote and run a commercial emergency lighting installation

A practical guide for electrical contractors on quoting and running commercial emergency lighting installations. Covers site survey, luminaire schedules, pricing the certification scope, installation programming, commissioning tests, and converting the job into an ongoing maintenance contract.

11 min read
How-to guideIntermediate

How to set up and run an AV service and maintenance contract

Most AV integrators rely entirely on project revenue. This guide shows how to set up, price, and operationally deliver an AV service and maintenance contract - from scope definition and SLA tiers to PPM scheduling, billing, and renewal.

11 min read
How-to guideAdvanced

How to quote and run a commercial asbestos survey and removal contract

A step-by-step guide for HSE-licensed asbestos removal contractors covering how to structure quotes that capture every compliance cost, manage the 14-day notification timeline, and invoice correctly from survey to Certificate of Reoccupation.

10 min read
How-to guideIntermediate

How to quote and run a domestic EV charging installation

A domestic EV charging installation takes half a day on site but has a compliance chain that catches many electricians out. This guide covers the OZEV grant process from April 2026, BS 7671:2018+A4:2026 requirements, and how to run a clean survey-to-invoice process across every job.

12 min read
How-to guideIntermediate

How to quote and manage a healthcare and pharmaceutical promotional merchandise order

Healthcare and pharmaceutical clients offer high-value, predictable accounts for promotional merchandise distributors - but they come with complex compliance requirements. This guide covers how to identify your client type, navigate the ABPI Code 2024, price for extended approval timelines, and manage multi-site delivery and reorders.

9 min read
How-to guideIntermediate

How to quote and run a retail shop lighting installation

Retail lighting projects are routinely underquoted and overrun because the brief arrives incomplete and the access constraints are priced too low. This guide covers every stage from survey to handover: how to specify against CIBSE LG17, build a compliant quote, manage procurement lead times, and deliver a full documentation pack that passes any landlord or insurance audit.

12 min read
How-to guideIntermediate

How to quote and manage a conference delegate merchandise pack

A conference delegate pack involves five to eight product lines, multiple suppliers, and a fixed event date that does not move. This guide covers how to brief, quote, order, and deliver a complete delegate pack without missing the event.

10 min read
How-to guideIntermediate

How to quote and manage a sustainable merchandise order

Sustainable merchandise orders are more complex than standard jobs. This guide covers how to verify certifications, qualify suppliers, write accurate briefs, build in realistic lead times, and pass compliance documentation through to your client at delivery.

8 min read
How-to guideIntermediate

How to quote and manage a reception and breakout furniture project

A step-by-step guide for contract furniture dealers on scoping, quoting, and managing reception and breakout furniture projects - from the first client brief through multi-manufacturer order management, mid-project specification changes, and final snagging.

11 min read
How-to guideIntermediate

How to quote and run a commercial demolition and strip-out contract

A guide for commercial demolition and strip-out contractors covering how to define scope, manage R&D surveys and CDM obligations, price the job accurately, run the programme, and close the final account with full documentation.

10 min read
How-to guideIntermediate

How to quote and manage a facilities management contract

A facilities management contract renews every month and runs continuously across its full term. This guide covers how to scope the asset base, choose the right pricing model, build a PPM schedule, manage reactive call-outs, and bill monthly so every visit is documented and every variation gets paid.

12 min read
How-to guideIntermediate

How to quote and run an education AV installation

Schools follow different procurement rules from corporate clients. This guide covers UK education AV procurement routes, the five system zones in a typical project, installation programme management around term-time constraints, and handover documentation requirements.

11 min read
How-to guideIntermediate

How to quote and manage a commercial energy audit

Commercial energy audit projects lose margin in three places: underestimated site time, unbounded report revisions, and compliance scope that surfaces mid-engagement. This guide covers how to scope, quote, run, and close an energy audit engagement profitably - from data collection to follow-on work.

10 min read
How-to guideIntermediate

How to quote and run an architectural lighting project

Architectural lighting projects require a different approach to quoting, procurement, and commissioning than standard commercial electrical work. This guide covers how to read a luminaire schedule, manage bespoke lead times, price controls scope, and deliver a clean handover.

10 min read
How-to guideIntermediate

How to quote and manage a print and signage order

Print and signage orders are unforgiving: once in production, mistakes can only be fixed with a reprint. This guide covers how to spec the job accurately, manage artwork approval, coordinate trade suppliers, and close the order cleanly before raising the final invoice.

10 min read
How-to guideIntermediate

How to quote and run a commercial drainage installation

A step-by-step guide for commercial drainage contractors covering how to read a drainage design, price pipe runs and SuDS elements, manage Building Regulations Part H and Section 106 approvals, run the installation to a tested handover, and recover cost when ground conditions differ from the design.

9 min read
How-to guideIntermediate

How to quote and run a commercial painting and decorating contract

Commercial painting and decorating contracts differ from residential work at every operational level. This guide covers how to quote by zone and surface, price preparation separately, plan a programme for an occupied site, manage variations, and invoice in stages from mobilisation to practical completion.

7 min read
How-to guideIntermediate

How to quote and manage a university and schools promotional merchandise order

University and schools promotional merchandise orders are among the most repeatable in the distributor's book - but hard seasonal deadlines, multi-layer brand approval, and split deliveries make them unforgiving. This guide covers the full process from quoting to delivery and account retention.

10 min read
PlaybookIntermediate

Creditor days benchmarks for UK trade businesses

Creditor days measures how long your business takes to pay trade suppliers. For UK trade businesses, a healthy figure depends on where you sit in the payment chain, not a single industry average. This guide gives the formula, sector benchmarks, and a diagnostic framework for reading your own number.

9 min read
How-to guideIntermediate

Utilization rate: benchmarks and worked examples

Utilization rate is the one number that tells an equipment-heavy or people-heavy service business whether its capacity and workload are properly matched. This guide explains the formula, shows how to choose the right benchmark for your asset type, and walks through three fully worked examples across hire fleets, trade businesses, and construction plant.

9 min read
How-to guideIntermediate

Boardroom AV installation costs: what drives the price

Boardroom AV installation in the UK runs from around £9,500 for a straightforward system to over £35,000 with DSP audio and custom control. The final number is determined by five decisions made before any kit is chosen.

8 min read
How-to guideIntermediate

How to quote and run a commercial tiling contract

Commercial tiling contracts carry hidden costs that standard per-m² rates never cover: substrate levelling, wet area tanking, pattern complexity, and programme delays. This guide covers how to quote accurately, scope the contract, and run the project from substrate check to final invoice.

10 min read
TemplateBeginner

What to include in a quote

A professional quote must contain nine core sections to be both legally sound and easy to accept. This guide breaks down each section - from line-item pricing to your validity period and acceptance mechanism - so you can build a reusable template that works across every type of job or order.

9 min read
How-to guideIntermediate

How to quote and run a commercial floor screeding contract

A practical guide for commercial floor screeding contractors covering how to build an accurate m² take-off, price by screed type and depth, coordinate programme timing on commercial sites, manage drying time, and invoice on completion.

10 min read
How-to guideIntermediate

How to quote and manage a branded technology merchandise order

Branded technology merchandise - power banks, wireless chargers, USB drives, and NFC products - carries higher average order values than most promotional categories. But tech orders have specific compliance requirements, longer lead times, and branding constraints that can erode margin if your quote doesn't account for them. This guide covers every step from reading the brief to delivering a confirmed, compliant order.

9 min read
How-to guideIntermediate

How to quote and manage an employee welcome kit order

Employee welcome kit orders look straightforward but involve multi-product quoting, artwork coordination across several suppliers, kitting and assembly costs, and a delivery model that varies by client. This guide covers each stage from brief to dispatch.

12 min read
How-to guideIntermediate

How to quote and manage a healthcare furniture project

A step-by-step guide for contract furniture businesses delivering healthcare furniture projects. Covers NHS procurement frameworks, HTM 63 and HTM 71 compliance, planning installation in live clinical environments, multi-stakeholder sign-off, and close-out documentation.

11 min read
How-to guideIntermediate

How to quote and run a commercial ground-mounted solar PV installation

A practical guide for solar PV installers quoting and running commercial ground-mounted systems. Covers site survey, planning permission, G99 process, groundworks, foundation options, commissioning, and how to structure O&M proposals from the start.

12 min read
How-to guideIntermediate

How to quote and manage a video conferencing and hybrid meeting room installation

Hybrid working has turned video conferencing room installation into one of the most common AV contracts in the UK. But many integrators still underprice them by missing network infrastructure, platform licensing, and support costs. This guide covers every stage from site survey to post-handover support contracts.

10 min read
How-to guideIntermediate

How to quote and manage a charity and fundraising merchandise order

Charity and fundraising merchandise orders bring specific operational pressures that differ from a standard corporate brief: fixed event deadlines, tight budgets, MOQ clashes, and UK VAT considerations. This guide walks promotional merchandise distributors through how to qualify, quote, and manage these orders from first inquiry to on-site delivery.

10 min read
PlaybookIntermediate

How to quote and run a commercial plastering contract

Commercial plastering contracts run to architect specifications, main contractor programmes, and sub-contract agreements. This guide covers quoting, pricing, CIS obligations, site coordination, variation management, and payment applications from tender to final account.

13 min read
How-to guideIntermediate

How to quote and run a commercial heat pump installation

A practical guide for commercial heat pump installers covering the full project lifecycle: from initial site survey and heat loss calculation through system design and quoting to MCS certification and BUS grant redemption.

10 min read
PlaybookIntermediate

How to quote and run a commercial external wall insulation installation

A practical guide for external wall insulation contractors covering site survey, system specification, tender preparation, sub-contractor coordination, variation management, and stage invoicing from mobilisation through to final account and defects liability period.

12 min read
How-to guideIntermediate

How to quote and run a commercial scaffolding contract

A practical guide for scaffolding contractors covering how to build an accurate commercial quote, run the hire period, manage adaptations and extended hire, and close out the job without leaving money on the table.

11 min read
How-to guideIntermediate

How to manage pre-production sampling and client approval in a promotional merchandise business

Running a structured pre-production sampling process is the difference between orders that deliver on time and ones that fall apart during approval. This guide covers sample types, supplier briefing, client approval, and tracking across live orders for promotional merchandise distributors.

8 min read
How-to guideIntermediate

How to quote and run a commercial brickwork and masonry contract

A step-by-step guide for brickwork subcontractors and masonry contractors covering quantity take-off, labour and material pricing, subcontract terms, on-site programme management, variation control, and final account preparation on commercial projects.

11 min read
How-to guideIntermediate

How to quote and run a commercial steelwork installation

A practical step-by-step guide for structural steelwork contractors, covering tender assessment, quantity take-off and estimation, fabrication and erection programme management, UKCA marking compliance, and how to close out the final account successfully.

9 min read
How-to guideIntermediate

How to quote and run a commercial sprinkler and fire suppression installation

Commercial sprinkler and fire suppression installation is compliance-critical work where quotes need to reflect hydraulic engineering and LPS 1048 certification requirements. This guide covers the full process from site survey through to Certificate of Conformity and maintenance contract handover.

10 min read
How-to guideIntermediate

How to quote and run a raised access flooring installation

A practical guide for raised access flooring contractors and fit-out specialists. Covers site survey requirements, PSA and BS EN 12825 specification, how to structure your quote, installation sequencing around other trades, managing site condition variations, and closing out with snagging, spares, and O&M documentation.

12 min read
How-to guideIntermediate

How to quote and manage a promotional merchandise awards and recognition programme

Awards and recognition programmes are among the most commercially valuable order types a promotional merchandise distributor can win. This guide covers how to capture the full brief, build a tiered product specification, price personalised awards accurately, manage recipient data and artwork proofs, and set up the programme for repeat annual delivery.

10 min read
How-to guideIntermediate

How to quote and run a commercial glazing and fenestration installation

Commercial glazing projects require precise quoting, careful procurement sequencing, and rigorous variation control. This guide covers system selection, quote scoping, glass lead times, installation management, and final account recovery for specialist glazing and facade contractors.

11 min read
How-to guideIntermediate

How to quote and run a commercial ventilation and extraction installation

A practical guide for ventilation contractors covering the full project lifecycle: how to qualify an enquiry, carry out a site survey, calculate airflow requirements, build an accurate quote, manage procurement, run the installation, commission the system, and produce compliant handover documentation.

12 min read
How-to guideIntermediate

How to quote and manage a franchise merchandise programme

A franchise merchandise programme means managing ongoing supply to multiple franchisee buyers against a centrally approved product range. This guide covers how to quote the programme, get artwork approved through the franchisor, and set up call-off ordering for franchisees.

11 min read
How-to guideIntermediate

How to quote and run a commercial kitchen fit-out

A commercial kitchen fit-out involves coordinating gas engineers, electricians, plumbers, ventilation specialists, and catering equipment suppliers across a project that can run from £30,000 for a compact café kitchen to £150,000 for a hotel operation. This guide covers every stage from site survey and quotation through to compliance, commissioning, and final handover.

12 min read
How-to guideIntermediate

How to quote and run a data cabling and structured cabling installation

Data cabling contractors often lose margin not at installation but at the quoting stage. This guide covers site survey, accurate per-drop pricing, procurement, programme management, Fluke certification testing, and producing a handover pack that closes the job cleanly.

11 min read
How-to guideIntermediate

How to quote and run a passive fire protection installation

Passive fire protection demand is rising fast following the Building Safety Act 2022. This guide walks contractors through pre-quote surveys, schedule of rates pricing, product system matching, and the golden thread documentation required at handover.

10 min read

Ready to put these ideas into practice?

Book a free demo and see how Zigaflow fits your team.