SEG tariff: what solar customers get paid for exported power
A SEG tariff is the per-kWh rate a licensed electricity supplier pays a small generator, such as a solar customer, for surplus electricity exported to the grid.
In short
A SEG tariff is the per-kWh rate a licensed supplier pays for power a small generator exports to the grid, and it needs an export meter and usually MCS certification. Quote it as an estimate with stated assumptions rather than a fixed payback.
A Smart Export Guarantee (SEG) tariff is the per-kWh rate a licensed electricity supplier pays for surplus power that a small generator sends back to the grid. In Great Britain, the supplier that holds a SEG licence pays it, and the household or business receives it provided the installation is up to 5 MW, is registered with the supplier, has an export meter that measures outbound flow, and (for most tariffs) comes with an MCS certificate from an MCS-certified installer.
How a SEG tariff works
The scheme launched on 1 January 2020 and is overseen by Ofgem, the GB energy regulator. Suppliers with at least 150,000 domestic customers must offer at least one export tariff, and smaller suppliers can join voluntarily. Each licensee sets its own rate, contract length and conditions, but the rate must always be above zero. Payments are calculated from export meter readings, so a customer with no export measurement has nothing to bill against.
Eligible technologies are solar PV, wind, hydro and anaerobic digestion up to 5 MW, plus micro-CHP up to 50 kW. In practice almost all registered installations are solar PV.
What the customer needs in place
- An eligible, grid-connected installation in Great Britain.
- An MCS certificate and an MCS-certified installer, which most suppliers ask for with the application.
- A meter that records export, and often a smart meter that reports half-hourly readings.
- An application to the chosen supplier, who does not have to be the customer's import supplier on every tariff.
Rates change
Suppliers set SEG rates themselves and can revise them. Published figures are a snapshot, so check the supplier's own tariff page on the day you quote.
Why rates vary so much
Headline rates in 2026 range from a few pence to well over 20p per kWh, according to installer comparison sites. The highest rates usually bundle export with import, so the customer must also buy electricity from that supplier, and some require the supplier to have fitted the system or require a home battery. Supplier-agnostic tariffs let the customer keep their existing import deal but tend to pay less.
A simple equation shows the stakes:
Annual export income = kWh exported per year x export rate (£ per kWh)
Worked example: a system exports 3,000 kWh a year. At 12p per kWh the income is 3,000 x £0.12 = £360. At 24p per kWh it is 3,000 x £0.24 = £720. The same panels produce a £360 difference a year, purely from the tariff, and a rate cut changes the payback again.
Quoting SEG income accurately
Installers should present export income as an estimate with its assumptions stated: the tariff name, the rate on the quote date, any import or battery condition, and the exported kWh used. Avoid promising a fixed payback period, because the rate is not fixed by the scheme. Keep the MCS certificate and meter details with the job so the customer can apply without delay.
Teams that build quotes from standard document templates can keep a consistent SEG paragraph and assumptions table on every proposal, so the wording stays accurate from one customer to the next. For more on the sector, see renewables and solar.