BUS voucher applications are submitted after the quote is accepted but before installation starts - managing the timing window across multiple live jobs is difficult without a clear status tracker for each grant application.
MCS 015 heat loss calculations must be completed to a specific standard and stored on file - paper-based site surveys get lost or are incomplete, creating delays at MCS certificate registration.
Equipment lead times for heat pump units and cylinders can stretch to 4-6 weeks - without a purchase order linked to the job's installation date, procurement slips and voucher expiry dates are missed.
See it live
Want to see this workflow in Zigaflow?
Book 30 minutes with Tim and we'll run through your exact process live.
Book a free demo →Build your own workflowAV Dry Hire Kit Dispatch and Return
Covers the end-to-end process for an AV hire business managing dry hire kit - from deposit collection and kit prep through signed dispatch, return inspection, damage resolution, and final invoicing.
Audio-Visual - Managing an AV Equipment Hire Job
A complete operational workflow for AV hire businesses, covering written booking confirmation through kit preparation, dispatch, show-day additions, kit return and condition check, and same-day invoicing.
AV System Integration - Running the Commissioning and Handover Process
A structured workflow for AV system integrators running the commissioning and handover phase of an installation project - covering pre-commissioning checks, component and signal flow testing, end-user acceptance, handover pack compilation, and same-day invoicing. Ensures the commissioning milestone is documented, signed off, and invoiced on the day it is achieved.
Got a different workflow?
Describe your process in plain English and we'll map it to Zigaflow in seconds.
Build my workflow →