Renewables - Heat Pump Survey to Commissioning

7 steps. Survey to MCS certificate. One system.

Step by step
1
Enquiry and Eligibility CheckLeads

Capture the customer enquiry, log property type, current heating system, and EPC status to assess BUS grant eligibility at first contact.

2
Site Survey and Heat Loss CalculationeForms App

Conduct the site visit and complete the MCS 015 heat loss calculation using the eForms App. Store the survey report against the lead record.

3
System Design and Customer QuoteQuotes

Build the quote with itemized lines for the heat pump unit, cylinder, controls, pipework upgrades, commissioning labour, and MCS registration fee. Show the BUS grant deduction as a visible line item.

4
BUS Grant ApplicationJobs

Submit the Boiler Upgrade Scheme application to Ofgem before installation begins. Log the voucher reference number and expiry date in the job record.

5
Equipment ProcurementPurchase Orders

Raise purchase orders for the heat pump unit, cylinder, and ancillary materials. Track expected delivery dates against the planned installation start date.

6
Installation and CommissioningeForms App

Complete installation and capture the commissioning checklist digitally, including system pressure test, flow temperatures, controls setup, and customer handover sign-off.

7
MCS Registration and Final InvoiceInvoices

Register the MCS certificate within 10 working days of commissioning. Attach the certificate to the job record and raise the final invoice with BUS grant credit applied.

What this workflow solves

BUS voucher applications are submitted after the quote is accepted but before installation starts - managing the timing window across multiple live jobs is difficult without a clear status tracker for each grant application.

MCS 015 heat loss calculations must be completed to a specific standard and stored on file - paper-based site surveys get lost or are incomplete, creating delays at MCS certificate registration.

Equipment lead times for heat pump units and cylinders can stretch to 4-6 weeks - without a purchase order linked to the job's installation date, procurement slips and voucher expiry dates are missed.

Frequently asked questions

See it live

Want to see this workflow in Zigaflow?

Book 30 minutes with Tim and we'll run through your exact process live.

Book a free demo →Build your own workflow
Workflow Builder

Got a different workflow?

Describe your process in plain English and we'll map it to Zigaflow in seconds.

Build my workflow →